Please Click on The Answer To Check Your Guess
67) The Flow-duration Curve At A Given Head Of A Hydroelectric Plant Is Used To Determine
total Power Available At The Site.
total Units Of Energy Available.
load-factor At The Plant
diversity Factor For The Plant
Previous
|
Medium (Difficulty Level)|
Next
Previous
|
Electrical ( Category) |
Next
Previous
|
Date Wise (As Submitted)|
Next
This is Medium Level Question in English Language Posted By Sunil Saharan in Engineering --> Electrical Category (Viewed : 87 Times)
Those who had coins, enjoyed in the rain.
Those who had notes, were busy looking for shelter.
-- Unknown
Tanhayee Mera Theekana
Tere Jaane Se
Tujhe Bhool Kar Jeeyein
Tere Khush Rahne Ki Dua Sad Shayari
Mehsoos To Karta Hun
Site Statistics
Stats at a Glance
Articles: 54
Viewed: 391963 Times
Photos : 53
Viewed: 576258 Times
Questions : 2344
Viewed: 202803 Times
Page Load No. 3172669
Articles
Photos
Take Quiz
1 Liners For Exam
Show Questions(1 by 1)