374) A Maintenance Service Facility Has Poisson Arrival Rates, Negative Exponential Service Time And Operates On A ‘first Come First Served’ Queue Discipline. Break Downs Occur On An Average Of 3 Per Day With A Range Of Zero To Eight. The Maintenance Crew Can Service An Average Of 6 Machines Per Day With A Range Of Zero To Seven. The Mean Waiting Time For An Item To Be Serviced Would Be
16 Day
13 Day
1 Day
3 Days
Hint
No Hint Found
Previous | Medium (Difficulty Level)| Next
Previous | Mechanical ( Category) | Next
Previous | Date Wise (As Submitted)| Next
This is Medium Level Question in English Language Posted By Sunil Saharan in Engineering --> Mechanical Category (Viewed : 347 Times)

Those who had coins, enjoyed in the rain. Those who had notes, were busy looking for shelter.

-- Unknown
Site Statistics
Stats at a Glance

Articles: 54
Viewed: 400791 Times
Photos : 53
Viewed: 580743 Times
Questions : 2344
Viewed: 291441 Times
Page Load No. 3279427

Articles
Photos
Take Quiz
1 Liners For Exam
Show Questions(1 by 1)
 ©2011-2023 SunilSaharan.In