Please Click on The Answer To Check Your Guess
363) A Welding Operation Is Time-studied During Which An Operator Was Pace-rated As 120%. The Operator Took, On An Average, 8 Minutes For Producing The Weld-joint. If A Total Of 10% Allowances Are Allowed For This Operation, The Expected Standard Production Rate Of The Weld-joint (in Units Per 8 Hour Day) Is
Previous
|
Medium (Difficulty Level)|
Next
Previous
|
Mechanical ( Category) |
Next
Previous
|
Date Wise (As Submitted)|
Next
This is Medium Level Question in English Language Posted By Sunil Saharan in Engineering --> Mechanical Category (Viewed : 209 Times)
Man and God both met somewhere,
Both exclaimed :
My creator.
-- Unknown
Tanhayee Mera Theekana
Tere Jaane Se
Tujhe Bhool Kar Jeeyein
Tere Khush Rahne Ki Dua Sad Shayari
Mehsoos To Karta Hun
Site Statistics
Stats at a Glance
Articles: 54
Viewed: 392467 Times
Photos : 53
Viewed: 576426 Times
Questions : 2344
Viewed: 208781 Times
Page Load No. 3179806
Articles
Photos
Take Quiz
1 Liners For Exam
Show Questions(1 by 1)