Please Click on The Answer To Check Your Guess
363) A Welding Operation Is Time-studied During Which An Operator Was Pace-rated As 120%. The Operator Took, On An Average, 8 Minutes For Producing The Weld-joint. If A Total Of 10% Allowances Are Allowed For This Operation, The Expected Standard Production Rate Of The Weld-joint (in Units Per 8 Hour Day) Is
Previous
|
Medium (Difficulty Level)|
Next
Previous
|
Mechanical ( Category) |
Next
Previous
|
Date Wise (As Submitted)|
Next
This is Medium Level Question in English Language Posted By Sunil Saharan in Engineering --> Mechanical Category (Viewed : 250 Times)
साख बनाने में बीस साल लगते हैं और उसे गंवाने में बस पांच मिनट, अगर आप इस बारे में सोचेंगे तो आप चीजें अलग तरह से करेंगे।
It Takes 20 Years To Build A Reputation And Five Minutes To Ruin It. If You Think About That, You'll Do Things Differently.
-- Warren Buffett
Tanhayee Mera Theekana
Tere Jaane Se
Tujhe Bhool Kar Jeeyein
Tere Khush Rahne Ki Dua Sad Shayari
Mehsoos To Karta Hun
Site Statistics
Stats at a Glance
Articles: 54
Viewed: 400791 Times
Photos : 53
Viewed: 580750 Times
Questions : 2344
Viewed: 292132 Times
Page Load No. 3280125
Articles
Photos
Take Quiz
1 Liners For Exam
Show Questions(1 by 1)