Please Click on The Answer To Check Your Guess
363) A Welding Operation Is Time-studied During Which An Operator Was Pace-rated As 120%. The Operator Took, On An Average, 8 Minutes For Producing The Weld-joint. If A Total Of 10% Allowances Are Allowed For This Operation, The Expected Standard Production Rate Of The Weld-joint (in Units Per 8 Hour Day) Is
45
50
55
60
Hint
No Hint Found
Previous | Medium (Difficulty Level)| Next
Previous | Mechanical ( Category) | Next
Previous | Date Wise (As Submitted)| Next
This is Medium Level Question in English Language Posted By Sunil Saharan in Engineering --> Mechanical Category (Viewed : 209 Times)

Man and God both met somewhere, Both exclaimed : My creator.

-- Unknown
Site Statistics
Stats at a Glance

Articles: 54
Viewed: 392467 Times
Photos : 53
Viewed: 576426 Times
Questions : 2344
Viewed: 208781 Times
Page Load No. 3179806

Articles
Photos
Take Quiz
1 Liners For Exam
Show Questions(1 by 1)
 ©2011-2023 SunilSaharan.In